|
|||||
University
of Oregon |
![]() |
||||
![]() |
Texas
Tech University Jones SBC Stadium A major stand alone addition to the existing stadium at the west-seating bowl. The project consists of concrete intermediate and club levels, composite steel suites and press levels. The structural drawings were issued in various packages for fast track construction. |
||||
The
University of South Carolina A 10,000-seat addition with a concrete frame and precast floor decks. The construction for this project was successfully completed within eigth months between football seasons. With 45-foot cantilevers supporting the lower and upper seating decks, the structural design was governed by the vibration criteria. A three-dimensional computer model was developed using SAP90 general analysis program. The acceleration due to the impact of spectators was maintained at less than 5% of ground acceleration. |
![]() |
||||
![]() |
South
Alabama University Arena Mobile, Alabama A 263 ft. x 298 ft. clear-span roof structure for the 8000-seat multipurpose arena. The roof structure is designed to support 100,000 pounds of rigging loads. |
||||
Nampa Arena |
![]() |
||||