University of Oregon
Autzen Stadium Expansion and Renovation

Eugene, Oregon


Texas Tech University Jones SBC Stadium
Lubbock, Texas

A major stand alone addition to the existing stadium at the west-seating bowl. The project consists of concrete intermediate and club levels, composite steel suites and press levels. The structural drawings were issued in various packages for fast track construction.


The University of South Carolina
South End Zone Addition
Columbia, South Carolina

A 10,000-seat addition with a concrete frame and precast floor decks. The construction for this project was successfully completed within eigth months between football seasons. With 45-foot cantilevers supporting the lower and upper seating decks, the structural design was governed by the vibration criteria. A three-dimensional computer model was developed using SAP90 general analysis program. The acceleration due to the impact of spectators was maintained at less than 5% of ground acceleration.


South Alabama University Arena
Mobile, Alabama

A 263 ft. x 298 ft. clear-span roof structure for the 8000-seat multipurpose arena. The roof structure is designed to support 100,000 pounds of rigging loads.

Nampa Arena
Nampa, Idaho